We install your EV charger in your communal garage

We support you throughout the entire process of installing a charging point in your communal garage, safely and in compliance with current regulations, including advice on the procedures required with the residents’ association.

What we offer

PRIVATE/SHARED CHARGING

Depending on the number of residents interested.

SMART CHARGERS

With power balancing, app control and scheduled charging.

QUOTE

For the full installation.

FLEXIBLE FINANCING

From 3 to 72 months.

TECHNICAL SUPPORT

And after-sales service with the Ecorecargo guarantee.

EXPERT ADVICE

To optimise your electricity bill and reduce charging costs.

Our Chargers

V2C Trydan Charger

Installation from

1,100 €
VAT not included

Installation includes:

  • V2C Trydan charger
  • Cabling and trunking
  • Dedicated electrical protection
  • Installation and commissioning
  • Certification and legalisation
  • 2-year warranty on product and installation

Wallbox Charger

Installation from

1,130 €
VAT not included

Installation includes:

  • Wallbox charger
  • Cabling and trunking
  • Dedicated electrical protection
  • Installation and commissioning
  • Certification and legalisation
  • 3-year warranty on product and installation

What we assess

  • Whether there is an existing shared pre-installation or a new cable route needs to be created.
  • Access to the meter room and the cable route to your parking space.
  • Whether other chargers are already installed.
  • The characteristics of the garage: enclosed or open, number of floors and proximity to the meter rooms.

Request your quote

    Frequently asked questions

    You can install one at a detached house, in a private garage or in a parking space within a communal residential garage.

    You must inform the residents’ association. In many cases, formal authorisation is not required; you only need to notify the president or property manager.

    Yes, but you will need authorisation from the owner of the parking space. You can then include this authorisation when notifying the residents’ association.

    Not necessarily. With chargers equipped with load balancing (dynamic power control), installation may be possible without increasing your contracted power. However, this will depend on your electricity consumption and the conditions of the installation.

    It depends on each case, but in many homes the installation can be completed in less than one day.

    Customer reviews

    The brands we work with

     

    Request a no-obligation quote

    Copyright © 2026 | All rights reserved - Developed by VGS